NOTICE:
Detial using method of hand impulse sealer:
1, choose a flat table, put the machine, can be the case of the machine to pull the machine easy to observe.
2, the head of the hand-held plug into the socket and tighten the induction on the panel. Pay attention to positioning gap
3, the power line plug into the socket on the rear panel of the chassis, the other end is inserted into the power supply socket, please use the single-phase three wire power.
4, open the power switch on the rear panel of the chassis (POWER SW.) “,” according to the panel power switch (SWITCHING) to be “ready” button, (WARM UP) “the green light, the machine can work.
5, hold down the “BUTTON SETTING” button, set the appropriate value, generally in 0.5-2.0 seconds.
6, the sensing head cover on the container, click on the handle of the start button, then the “heating (HEATING)” red light, said it is heated, remove the sensor head don’t, “heating (HEATING)” red light is off after removing the inductive head, such as “ready (WARM UP)” green light machine or buzzer sound short “beep” prompt and can work under a sealed container.
©Shandong China Coal New Energy Import Export Co., Ltd. © 2017
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China