NOTICE:
Automatic filling and sealing machine safe operating procedures as following:
First, operation methods:
1.Press “ON” button, power light, “COOLER” (cooling LED) lights, lights flashing.
2.press the “start” button, lights off, “START” indicator light, power to achieve a predetermined setting.
3.Turn the power conveyor, conveyor belt running, adjust the speed knob to the proper position.
4.push into the sealed container, the machine begins normal operation.
5.When the stream occur, “FAULT” on the control panel (overcurrent indication) lights, warning lights flashing, then press the “RESET” (RESET) button until the overcurrent lights off, then re-press ” START “button.
6.when the work is finished, press “STOP” (Stop) button, the machine back to the 1 state.
7.press“OFF” button, the machine turned off, out of standby.
Second, the operating process considerations and routine maintenance
1.the metal is not near the sensing head.
2.always check the cooling water level, when generally used frequently, checked weekly, and supplement cooling water. It is preferable to use a non-conductive cooling water.
3.often check the pipe, fittings can not have water leakage. To prevent the temperature is too low to cause the pipe freezes, antifreeze should be injected into the tank.
4.maintenance should follow the order of operations.
5.maintenance professionals should be fixed.
6.the boot are not allowed to open the case, you must cut off the power when checking maintenance
©Shandong China Coal New Energy Import Export Co., Ltd. © 2017
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China