NOTICE:
The maintenance of the maintenance to the operation of the main, maintenance work with. Maintenance cycle can be set according to the working conditions and working conditions of the equipment, such as metal cutting machine can be set for 400~600 hours, and the time and maintenance time can be calculated according to the equipment per complex coefficient of 0.5.
(1) the automatic sealing machine shall be placed in ventilated and dry place, and the general room temperature is maintained at about 25.
(2) should be regularly dust, do not need to unplug the power, to cover, and keep the machine clean.
(3) if the working time is too long, the cooling switch should be opened before the shutdown.
(4) the high temperature belt shall be regularly removed from the dirt, in a hurry. To ensure the quality of sealing.
(5) serious wear parts should be replaced in time in order to extend the life of the whole machine.
©Shandong China Coal New Energy Import Export Co., Ltd. © 2017
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China