NOTICE:
The chamber vacuum machine is a new type of machine. Support the anchor screws smoothly, check whether the lid is smooth, and whether the connecting parts are loose and tightened during transportation. Check that the oil level of the vacuum pump is correct. If not, adjust it. Turn on the power, turn on the power switch, and check whether the vacuum pump runs normally. (If it is not pumping, it is likely that the vacuum pump motor is reversed. According to the vacuum pump arrow indication, any two-phase line of the three-phase power line should be replaced).
Select the required heating temperature according to the packaging film material and set the room vacuum machine temperature controller to the corresponding value (generally 110-135 degrees). Turn on the power switch, and then turn on the heating switch. When the temperature rises to the predetermined temperature, place the product on a tray or cardboard, lay it flat in the lower working room, press the manual lowering switch (ie, the work switch) in the lower right corner with your hand, and then cover the film. Pull from the back to the front and hold it in the suction film row, pull up the upper cover with both hands, remove the product to separate the packaging, and re-insert the work into the product to enter the next work cycle. During physical work, turn off the heating switch, vacuum pump switch, power switch, and disconnect the power supply of the machine. This equipment is equipped with an emergency stop function. If there is a special situation, please turn off the vacuum pump switch of the room chamber vacuum machine to stop working and deflate, and lift the cover.
©Shandong China Coal New Energy Import Export Co., Ltd. © 2017
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China